In June 2021, ERIELL Group performed hydraulic fracturing for the first time at the facilities of Jizzakh Petroleum JV in the Fergana region. At the Varyk field, two proppant hydraulic fracturing operations were carried out with a depth of oil reservoir from 3,600 to 3,800 metres.
After hydraulic fracturing at the...